Plan air conditioning before interior finishing
Renovating an apartment or finishing a house? Air conditioning pipework is worth preparing before plastering and painting. At Klimartin, we can carry out the work on two dates coordinated with your renovation schedule.
01 · Before finishing: installation preparation
We agree unit positions and routes, install refrigerant pipework and the necessary wiring, and prepare condensate drainage in accordance with the design and technical conditions.
02 · After renovation: final unit fitting
When finishing work is complete, we return to fit the units, make connections, carry out tests and commission the system.
A neat finish without reopening finished walls
Early planning helps conceal pipework and wiring and limits alterations to finished interiors. The equipment and installation route should be agreed before wall chases are made.
We serve Warsaw, surrounding towns, Zambrów and the other locations listed in our offer.
How should renovation be prepared for air conditioning?
Before starting, we establish the number of rooms, intended models and unit positions, route lengths, power supply and condensate drainage. This helps select suitable pipe sizes and avoid later changes.
Can the units be fitted only after renovation?
Yes. At the first stage, we prepare the agreed installation and protect its ends. Once the interior is ready, we fit the units, check for leaks, commission the system and explain operation in accordance with manufacturer requirements.
How much does two-stage installation cost?
The quote depends on the number of units, route lengths and routing, condensate drainage options and building type. Ask about the cost of both stages before renovation begins.
Explore our installation services, completed installations and installation in two stages. We cover Warsaw and surrounding areas and Zambrów and nearby towns. Scope, travel arrangements and quotations are confirmed individually.